Managing a Battery Abuse Test Lab: Safety Holds, Witnessing and Evidence

Author

Neerav Singh — TITAN TLM leadership team member portrait

Neerav Singh

Technical Product Specialist

Battery abuse test lab safety procedures, witness coordination, and evidence documentation

Managing a Battery Abuse Test Lab: Safety Holds, Witnessing and Evidence

A nail penetration test is over in about 10 seconds. The record of that test has to survive for years.

Between those two numbers sits the real work of a battery abuse testing lab. Engineers have been driving 3 mm steel rods into cells at 8 cm/s for decades and the mechanics are well understood. Trouble arrives later, when a customer, an auditor or a type approval authority asks the lab to show that the cell on the fixture was the right cell at the right state of charge, that every thermocouple was in calibration and that the witness saw what the report says they saw.

That question gets asked more often every year. Electric vehicles accounted for roughly 8% of the 891 vehicle recalls filed with NHTSA in 2025, covering just over 1 million vehicles, and every recall investigation leads straight back to test records. On 1 July 2026 the stakes climbed again. China's GB 38031-2025 now requires EV battery packs to show no fire and no explosion after thermal runaway, replacing the old 5 minute warning rule. A pass now rests on evidence of a non-event. Non-events are the hardest thing in testing to prove.

Labs that build evidence into the test itself are already seeing the return. One independent battery and HV lab running cell and pack validation across 3 UK sites lifted equipment utilisation at its primary site by 28% in its first quarter after connecting scheduling, calibration and reporting in one system.

This guide follows a single battery abuse test from request to archive. The timeline is a composite of how abuse labs run thermal runaway tests under different compliance standards. Each timestamp marks a point where evidence gets made.

blog-managing-battery-abuse-inside1-preprod.png

T minus 5 days: the test request lands

Every battery abuse test begins as a test request. Our example customer wants a cell level nail penetration test at 100% state of charge, witnessed and reported.

That request decides everything downstream. It picks the bunker, the fixture, the standard revision and whether a witness travels or watches a stream. Labs that accept requests by email lose detail right here. An email says "nail test, full charge" and the technician charges to the cell maximum when the customer meant the BMS limited voltage their pack uses. The cell gets destroyed under the wrong condition and nobody notices until the report review.

A structured request form closes that gap before a single cell arrives. Capture 7 fields at intake: standard and revision, SOC definition, chemistry and format, quantity including spares, witness requirement, data deliverables and disposal instructions. Those 7 fields prevent more retests than any fixture upgrade.

T minus 48 hours: the bunker gets booked

Abuse testing competes for a short list of scarce resources. The bunker, the high speed camera rig, the gas analysis train and the technician cleared for hazardous work all have to line up on the same morning. A battery test chamber used for thermal ramp tests is often shared with the cycling team down the corridor.

Double booking in a battery testing lab carries a safety cost on top of the schedule cost. A rushed changeover between a thermal chamber test and an abuse run is when exhaust checks get skipped.

An independent battery and HV lab running cell and pack validation across 3 UK sites lived this problem. Chamber and bench availability sat in shared spreadsheets updated unevenly across teams, and double bookings were routine. After moving to equipment level scheduling in TITAN, with cyclers, HV benches, thermal chambers and motor rigs modelled as separate resources, the lab cut scheduling conflicts by more than 90%. Request to confirmation time dropped from 3 to 4 days to under 24 hours.

T minus 24 hours: the calibration check

Thermocouples, voltage taps, the force transducer on the crush rig and the displacement sensor on the nail drive all carry calibration dates. If one has expired, the data is worthless and the cell is already gone. Battery abuse tests destroy the device under test. A rerun means a new cell, a new slot and often a new witness visit.

That same UK lab had kept calibration records for HV equipment, thermocouples and cyclers in a separate system with "no connection to the scheduling layer." Calibration status lived in one place. Bookings lived in another. Once calibration was tied to the equipment record that the scheduler reads, the lab recorded zero calibration lapses after go-live.

The principle is simple. A booking should refuse to confirm when any instrument on the test has an expired certificate. Leaving that check to a technician's memory at 7 a.m. invites the one miss that costs a full programme.

T minus 2 hours: the safety hold

The safety hold is the formal pause before energy goes into the cell. A typical hold checklist for a nail penetration or crush test covers:

  • Bunker clear with door interlocks tested
  • Exhaust and scrubber running at rated flow
  • Fire suppression armed and emergency stop verified
  • Cell SOC measured at the fixture and matched to the request
  • Thermocouple placement photographed against the test plan
  • Camera triggers armed and gas sampling lines purged

Two conditions make a hold worth anything as evidence. A named person must release it. The release must carry a timestamp. A paper sheet initialed in pencil and filed in a binder meets neither condition once the binder goes missing.

Building the hold as a configurable checklist inside the test record gives every item an owner and a time. A failed item stops the workflow at that step, so the trigger cannot be armed with a purge line still closed.

T minus 15 minutes: the witness arrives

Witness testing in battery safety work takes 2 forms. A customer engineer or notified body representative stands behind the blast glass, or watches a live stream from another continent. Either way the witness needs to see the same facts the report will later state.

Three habits make witnessed battery tests hold up under scrutiny. The technician reads the cell serial number aloud on camera. The SOC reading on the meter is shown to the lens before the door closes. The witness signs the pretest record before the trigger and signs the observation record after.

Remote witnessing adds one more duty. The stream recording itself becomes evidence and belongs in the test record with a hash or checksum, stored beside the raw data.

T zero: 10 seconds and 5 clocks

The nail enters. Cell voltage collapses. Surface temperature climbs. If the cell goes into thermal runaway, venting and flame can follow within seconds.

A single thermal runaway test feeds several acquisition systems at once. High speed video runs at thousands of frames per second. Thermocouples log at 10 Hz or faster. Voltage taps sample in kilohertz. Gas analyzers track CO, H2 and hydrocarbons. Each device keeps its own clock.

If the camera and the DAQ disagree by 2 seconds, the report cannot say whether venting came before or after the voltage drop. That sequence is often the entire finding. Fire a sync event at T zero, such as a trigger pulse recorded on every channel or a flash visible on every camera and log it in the test record.

T plus 1 hour: observation and quarantine

The strict compliance calls for a 1 hour observation period after the abuse event. Damaged cells can reignite well beyond that. Labs move the remains to a labelled quarantine area, log the transfer and keep watching.

The disposal record closes the chain of custody for the device under test. Without it, the evidence pack has a gap at the end, and gaps attract questions during ISO/IEC 17025 assessments. Log who moved the cell, where it went and when the disposal vendor collected it.

T plus 3 days: the report

Report assembly is where abuse labs quietly lose days. Before TITAN, the UK lab's engineers spent days pulling observations, cell statistics, thermal data and CAN logs out of disconnected systems and stitching them into a report by hand. With observation logging inside the test record and automated test report generation, reporting effort fell by about 45%.

A battery abuse test report that survives review states the standard and revision, every deviation from the method, the witness name and organization, the calibration certificate IDs for each instrument, pre and post test photographs and the synchronized timeline.

T plus 3 years: someone opens the file

A recall investigation starts. A GB 38031 resubmission comes due. An accreditation assessor pulls a random record. The person reading the file was never in the room and cannot ask the technician, who may have left the company.

Every entry should be attributable and contemporaneous, showing who recorded it and when. Raw files, photos and video belong in one record linked to the request, the hold, the witness signatures, the calibration state and the disposal log.

The same discipline carries over to the cycling floor, where high volume cell, module and pack labs run hundreds of cells in parallel and every channel needs the same traceability.

The 10 seconds everyone remembers

The cell is gone the moment the nail goes in. Left behind are a request, a hold, a signature, a calibration certificate, a video file and a report. That bundle is the only version of the test anyone will ever see again.

Labs that win repeat abuse work build that bundle as carefully as they build the fixture. The battery and HV testing labs doing it best let the evidence assemble itself while the test runs.

Under regulations, a pass depends on proving that nothing happened. The only proof a lab can offer is a record that a stranger can open years later and trust. Labs that manage battery and HV testing in a single connected record capture each step as the work happens. They spend less time rebuilding reports and walk into assessments with a complete file.

Talk to an Expert

Keep Every Battery Test Audit-Ready

Manage test requests, safety holds, calibration, witnessing and test records in one connected workflow.

Recent Blogs

AI Scheduling Software for Test Labs: How Finite Capacity Planning Makes AI Useful

AI Scheduling Software for Test Labs: How Finite Capacity Planning Makes AI Useful

A climatic chamber can sit idle for 9 hours on a Tuesday while 3 programmes wait for access. The calendar shows an open slot

Read more...

Booking a third-party test lab with test requirements, documentation, and testing coordination

Booking a Third-Party Test Lab: What to Send and What to Expect

That is how many laboratories held accreditation from signatories of the international accreditation arrangement in 2024, according to ILAC.

Read more...

Brake testing lab workflow connecting an inertia brake dynamometer, proving ground track testing and the final brake test report in one chain

Brake Testing Lab Workflow: Dyno, Track and Report in One Chain

A good brake stops a 2 tonne car from 100 km/h in about 3 seconds. Moving that same brake from a dyno cell to the

Read more...

NVH test campaign management showing an electric vehicle tested from component rig and subsystem dyno to full vehicle in an anechoic chamber

NVH Test Campaign Management from Component Rig to Full Vehicle

The decibel meter disagrees, of course. An electric vehicle is quieter overall than the combustion car it replaces.

Read more...

Physical test lab maturity stages after go-live on TITAN test lifecycle management platform

Beyond Go-Live: How Labs Mature on TITAN

A 2020 Boston Consulting Group study found that 70% of digital transformations miss their objectives, leaving just 30% that deliver

Read more...

THOR-50M and Hybrid III 50M crash test dummies compared side by side

THOR-50M vs Hybrid III: A Reference Comparison

Put a THOR-50M and a Hybrid III 50M through the same frontal crash test and they will tell you different stories about

Read more...

Test lab turnaround time measured from test request to approved report

Test Lab Turnaround Time: How to Measure It and How to Cut It

Search for "lab turnaround time" and page 1 belongs to hospitals. The top results discuss specimen accessioning,

Read more...

Developmental Test and Evaluation for verification tracking and test readiness

Developmental Test and Evaluation: The Discipline That Decides Whether a Program Is Actually Ready

A brake controller program carries 312 verification line items across 4 development builds. Build 3 closes 287 of them.

Read more...

Flight test management for test point planning, flight cards, data review, and certification traceability

What Flight Test Management Covers

A certification campaign on a business jet clears 240 test points across 38 sorties. On sortie 22 the instrumentation

Read more...

Idle test rig cost and equipment utilization in an engineering test lab

The Real Cost of an Idle Test Rig

A 4-post hydraulic durability rig carries a replacement value north of $2 million. An environmental chamber rated for combined

Read more...

Evolution of test management tools from spreadsheets to Test Lifecycle Management

The Evolution of Test Management Tools

Type "test management tools" into a search bar and you get 2 unrelated answers. One set of results covers Jira integrations

Read more...

ISO 17025 accreditation workflow for aerospace testing labs linking calibration records, procedure versions and operator credentials to test results

How to Maintain ISO 17025 Accreditation in Aerospace Testing Labs

It starts with a simple audit question: “Can you show me the calibration record for the equipment used in that test?”

Read more...

DVP&R breaks down long before the first test runs. How version control, dependency and resource gaps in spreadsheet verification plans affect program decisions.

Most DVP&R Processes Collapse Before the First Test Even Runs. Here's Why

At some point, the DVP spreadsheet becomes a source of questions instead of answers. Which test count is current?

Read more...

Battery test management for high-volume cell, module and pack labs - scheduling, calibration and traceability with TITAN TLM

Battery Test Management: How High-Volume Cell, Module and Pack Labs Stay in Control

Weeks into a battery cycle life test, the details start to accumulate: thousands of charge-discharge cycles,

Read more...

What Is a LIMS? A Complete Guide to Laboratory Information Management Systems

What Is a LIMS? A Complete Guide to Laboratory Information Management Systems

Test requests arrive. Samples or test articles need to be identified. Equipment has to be available and calibrated.

Read more...

Vibration Testing Management Platform showing shaker hour tracking, equipment utilization, maintenance scheduling, and test lab management with Titan TLM.

Vibration Testing Management: From Shaker Scheduling to Test Reports

Every vibration test bay runs on a simple ledger. Hours available on the shaker minus hours testing equals hours lost and eac

Read more...

Euro NCAP 2026 test lab operations - coordinating validation schedules, equipment and resources with TITAN TLM

Euro NCAP 2026: Inside the Operational Challenge for Test Labs

Euro NCAP 2026 puts a different kind of pressure on the test lab calendar. More safety functions need to be validated across more scenarios, with the right vehicles,

Read more...

UAV testing traceability chain linking a cargo drone from receiving inspection through test execution to airworthiness certification evidence

UAV Testing : Following the Traceability Chain of a Single Aircraft

Somewhere in a UAV qualification programme, a seemingly simple traceability question can become unexpectedly expensive.

Read more...

Automotive test operations unified on TITAN's Test Lifecycle Management platform for faster vehicle development

Faster Automotive Development Starts with Better Test Operations

Modern vehicle programs generate an enormous volume of validation activities, test data, schedules and engineering decisions.

Read more...

Crash test dummy evolution blog cover 75-year journey from Sierra Sam to Hybrid III, THOR and WorldSID in automotive safety

How Crash Test Dummies Changed Automotive Safety

In the late 1940s an Air Force flight surgeon named John Stapp noticed a grim pattern. More of his pilots were dying in cars than in planes.

Read more...

Dashboard representing test management for component manufacturers with centralized test planning, equipment management, DVP tracking, and compliance reporting.

Test Management for Component Manufacturers: How to Run Multi-Customer Validation Without Losing Control

Your lab validates parts for more than one customer. Each OEM arrives with its own requirements, its own report format

Read more...

Illustration of disconnected test workflows in physical labs and the case for connected Test Lifecycle Management

Stop Testing in Isolation: 4 Surprising Lessons from the Ground

Walk into almost any physical test lab and you will find smart people doing careful work inside their own four walls.

Read more...

Automotive test lab visual comparing LIMS with a purpose-built Test Lifecycle Management platform

Why Automotive Testing Labs Need More Than LIMS

When engineers at an automotive testing lab search for software to manage their operations, they often land on LIMS.

Read more...

Gantt chart or project timeline blog cover, TITAN guide to choosing the right view for test project and validation management

Gantt Chart or Timeline? Picking the Right View for Test Project Management

You open your scheduling tool on a Monday and the program looks healthy. Every test sits inside a neat colored bar

Read more...

7 critical problems with manual test tracking blog cover TITAN guide to fixing spreadsheet chaos in engineering test labs

7 Critical Problems with Manual Test Tracking in Engineering test labs

Despite advances in engineering software, many product validation teams still rely on spreadsheets, shared drives and email

Read more...

Test planning best practices blog cover TITAN guide to milestones, dependencies, coverage tracking and plan version control

Test Planning Best Practices: How TITAN Simplifies Test Plans, Milestones and Coverage

Ask a validation lead in any physical product test lab how their test plan started and you will hear about a spreadsheet.

Read more...

Electronic lab notebook ELN for engineering test labs — TITAN blog cover on test data capture, traceability and audit readiness

What Are Electronic Lab Notebooks? A Test Lab View

An electronic lab notebook (ELN) replaces the paper notebook used to record experiments, tests, and observations.

Read more...

Complete guide to test lab management 2026 — TITAN blog cover on scheduling, equipment, maintenance, allocation and reporting

The Complete Guide to Test Lab Management in 2026

Test labs have become one of the most constrained resources in modern product development. Validation timelines are shrinking

Read more...

Test planner guide for hardware validation with test lifecycle management workflow and validation process overview

A Test Planner's Guide to Hardware Validation

Hardware testing sits at the center of every reliable product program. For test planners, the work goes well past

Read more...

Component suppliers improving test lifecycle management with smarter validation, traceability, and engineering test workflows

Why Component Suppliers Are Rethinking Test Lifecycle Management

The global automotive material and component testing market reached roughly US$26.91 billion in 2025 and is on track

Read more...

Unified testing platform vs fragmented tools comparison visual — TITAN TLM blog cover on the cost of tool fragmentation

Advantages of using a Unified Testing Platform Over Fragmented Testing Tools

Ask anyone who runs a physical test lab what their week looks like and you will hear a familiar story. The test plan lands

Read more...

The next 5 years of physical product testing blog thumbnail — TIC industry forecast

The Next 5 Years of Physical Product Testing: A Prediction from the Industry Floor

A product engineer at a mid-size EV components manufacturer spent 14 weeks getting a battery module through

Read more...

How TIC labs can manage growing test volumes without losing control — blog thumbnail

How TIC Labs Can Manage Growing Test Volumes Without Losing Operational Control

The Europe Testing, Inspection and Certification (TIC) market is on a sustained growth path. Valued at USD 58.93 billion in 2025

Read more...

The ultimate guide to automotive crash testing — TITAN blog thumbnail

The Ultimate Guide to Automotive Crash Testing

Every vehicle on the road today carries the invisible fingerprint of crash testing. Before a single unit reaches a customer,

Read more...

How leading chassis and powertrain teams close the test traceability gap — blog thumbnail

How Leading Chassis and Powertrain Teams Are Closing the Test Traceability Gap

The launch of a dedicated chassis and powertrain testing focus at Vehicle Tech Week North America 2026

Read more...

Premium wake boat testing — marine engineering blog thumbnail

Premium Wake Boats and the New Rules of Marine Product Testing

Premium watersports boats have become among the most mechanically complex products in recreational manufacturing.

Read more...

Commercial vehicle test programs blog thumbnail — TITAN heavy-vehicle testing

What Euro NCAP's 2026 Truck Safety Results Mean for Commercial Vehicle Test Programs

Euro NCAP's 2026 truck safety assessment delivered a landmark result: five out of seven vehicles in the Regional Distribution category

Read more...

A Practical Guide to Choosing and Implementing a Laboratory Information Management System (LIMS)

A Practical Guide to Choosing and Implementing a Laboratory Information Management System (LIMS)

If you're still running your lab on a combination of spreadsheets, handwritten logs and shared folders with names

Read more...

What -30°C teaches you about a tire

What -30°C teaches you about a tire

In northern Finland, engineers listen to rubber meet ice in silence so complete it feels deliberate. What they're really chasing consistent

Read more...

When Robots Take the Wheel: What the Bundeswehr's Driverless Testing Shift Means for Modern Test Operations

When Robots Take the Wheel: What the Bundeswehr's Driverless Testing Shift Means for Modern Test Operations

Germany's Bundeswehr operates the Technical Centre for Land-Based Vehicle Systems (WTD 41) in Trier, a facility whose sole mandate is to ensure

Read more...

5 Questions Every VP of Engineering Should Ask About Their Test Operations

5 Questions Every VP of Engineering Should Ask About Their Test Operations

There's a particular kind of silence that falls over a lab when something goes wrong late in the testing cycle. Not the silence of focus or concentration. A heavier kind. The kind that settles

Read more...

Test Data Management: Best Practices for High-Volume Labs

Test Data Management: Best Practices for High-Volume Labs

In a high-volume R&D lab, data is everywhere and that's exactly the alarming problem. Test files, equipment logs, video recordings, structured forms, raw observations

Read more...

Digital Thread in Physical Product Testing: Hype or Reality?

Digital Thread in Physical Product Testing: Hype or Reality?

There is a phrase circulating in engineering circles that sounds almost too good to be true: the digital thread. A single, continuous digital data backbone that connects every phase

Read more...

How Proving Grounds Are Going Digital in 2026

How Proving Grounds Are Going Digital in 2026

Proving grounds have always been the backbone of vehicle validation. Tracks get booked, prototypes get tested, drivers get scheduled and data gets collected.

Read more...

Paper Records vs. LIMS: Choosing the Right Data Management Strategy for Your Lab

Paper Records vs. LIMS: Choosing the Right Data Management Strategy for Your Lab

For decades, paper-based record keeping was the backbone of laboratory operations. Binders stacked on shelves, handwritten test logs, manually updated calibration sheets;

Read more...

TITAN as The Inventory Management Platform

TITAN as The Inventory Management Platform

Running a modern testing or R&D lab without a reliable inventory management system is like navigating without a map. Equipment runs out mid-experiment. Critical spare

Read more...

AI in Test Scheduling: Six Use Cases Worth Watching

AI in Test Scheduling: Six Use Cases Worth Watching

Test scheduling looks administrative from the outside. Inside an engineering lab, it is one of the most layered coordination problems a team faces and one of the

Read more...

What Every Role in Your Test Lab Needs from One Platform

What Every Role in Your Test Lab Needs from One Platform

Running a hardware test lab means managing a constant flow of moving parts, schedules, resources, personnel, data or deadlines. When that flow is smooth,

Read more...

Implementing ALCOA in Your Lab: Gaps, Best Practices and What Good Looks Like

Implementing ALCOA in Your Lab: Gaps, Best Practices and What Good Looks Like

In the previous blog, we covered what the ALCOA principles are and why they apply to engineering and testing laboratories every bit as much as they do to pharmaceutical manufacturing.

Read more...

Why ALCOA Is Not Just a Pharma Principle: What Engineering and Testing Laboratories Need to Know

Why ALCOA Is Not Just a Pharma Principle: What Engineering and Testing Laboratories Need to Know

When most professionals hear the term ALCOA, they think of pharmaceutical manufacturing, clinical trials or FDA-regulated environments. That association is understandable, the ALCOA

Read more...

What Is a Design Verification Plan (DVP)? A Practical Guide for Test Engineers

What Is a Design Verification Plan (DVP)? A Practical Guide for Test Engineers

Design Verification Plans (DVP) sit at the heart of any product development program. They define what gets tested, when, how and to what standard.

Read more...

The Test Scheduling Problem Explained

The Test Scheduling Problem Explained

Ask any test engineer what slows down a program and you'll hear the usual answers. Equipment failures. Scope changes. Resource shortages.

Read more...

Home Grown Tools vs TITAN

Home Grown Tools vs TITAN

That internal tool your team built seven years ago. It was genuinely impressive at the time. Someone on the team had a problem; nobody had a budget for a proper solution

Read more...

3 Questions Your Dashboard Should Answer Instantly

3 Questions Your Dashboard Should Answer Instantly

There's a framework in operations management that measures any operation across four dimensions - Volume, Variety, Variation and Visibility.

Read more...

How Smart Scheduling Is Beating Million-Dollar Equipment Investments?

How Smart Scheduling Is Beating Million-Dollar Equipment Investments?

You invested heavily in advanced equipment because precision matters. Calibration matters. Speed to market matters. Yet despite those investments,

Read more...

Crash Test Dummies Aren’t Props, They’re Precision Instruments

Crash Test Dummies Aren’t Props, They’re Precision Instruments

Step into a contemporary crash testing facility and one thing becomes clear almost immediately.

Read more...

OEM and the Hidden Cost of Fragmentation: Why Test Lifecycle Management Matters?

OEM and the Hidden Cost of Fragmentation: Why Test Lifecycle Management Matters?

Picture a weekly sync inside an automotive OEM program, their verification and validation (V&V) teams racking their brains over spreadsheets.

Read more...

How Do You Build ISO/IEC 17025 Ready Labs with End-to-End Digital Traceability?

How Do You Build ISO/IEC 17025 Ready Labs with End-to-End Digital Traceability?

If you run or work with testing and calibration laboratories whether as an OEM lab, an independent testing facility

Read more...

Any Ambition Bigger Than a Spreadsheet?

Any Ambition Bigger Than a Spreadsheet?

Imagine this: It's late on a Friday evening, and Sarah, a dedicated vehicle test engineer at a leading R&D organization,

Read more...

The Cost of Inaction: Why Testing Teams Can't Afford to Delay a Test Lifecycle Management Solution

The Cost of Inaction: Why Testing Teams Can't Afford to Delay a Test Lifecycle Management Solution

Many engineering leaders already know their testing teams need a centralized system. The challenge?

Read more...

Best Practices in Lab Asset Management with Titan

Best Practices in Lab Asset Management with Titan

Modern laboratories operate under constant pressure: deliver accurate results faster, manage rising costs,

Read more...

Test Lifecycle Management Explained: What Every Engineering Team Needs to Know

Test Lifecycle Management Explained: What Every Engineering Team Needs to Know

When it comes to product development, testing is more than a box to check it’s the process that validates safety, performance,

Read more...

Can your booking tool do more than just schedule?

Can your booking tool do more than just schedule?

Titan's Booking Portal does more than just schedule. It’s a single platform that links test requests,

Read more...

Modernizing Lab Bookings: Email Requests vs. Titan Portal

Modernizing Lab Bookings: Email Requests vs. Titan Portal

When managing test labs or proving grounds, it’s common to rely on email threads and manually filled forms from customers

Read more...

TITAN for greenfield OEMs — managing the complete test lifecycle beyond your walls blog banner

Titan for Greenfield OEMs: Managing the Complete Test Lifecycle Beyond Your Walls

Building a product from the ground up as a Greenfield OEM comes with unique challenges.

Read more...

TITAN template-driven multi-product test management blog banner

How Titan’s Template-Driven Approach Simplifies Multi-Product Line Test Management

Engineering teams managing diverse product lines often face the challenge of maintaining consistency,

Read more...

How TITAN supports laboratories in achieving ISO/IEC 17025 compliance blog banner

How TITAN Supports Laboratories in Achieving ISO/IEC 17025 Compliance

Laboratories across industries are tasked with ensuring the highest standards of testing and calibration.

Read more...

Managing test articles seamlessly with TITAN — from creation to retirement blog banner

Managing Test Articles Seamlessly with Titan - from Creation to Retirement

In the world of product testing, managing prototype samples and test articles is often a logistical challenge.

Read more...

Rethinking test data governance — TITAN powers compliance, transparency and efficiency blog banner

Rethinking Test Data Governance: How TITAN Powers Compliance, Transparency, and Efficiency

In today’s data-driven testing environment, governance leaders face increasing pressure to ensure compliance

Read more...

Bridging the scheduling gap in modern test labs — TITAN best ally blog banner

Bridging the Scheduling Gap for Modern Test Labs: Why TITAN Is Your Lab's Best Ally

Imagine this: A test lab under constant pressure to meet deadlines is struggling with delays and resource conflicts.

Read more...

From feedback to feature — addition of inventory management to TITAN blog banner

From Feedback to Feature: The Addition of Inventory Management in TITAN

Over the years, Titan has evolved by listening closely to the needs and feedback of our customers. As a company that values

Read more...

The essential synergy — enhancing engineering verification with unified test and lab management blog banner

The Essential Synergy: How a unified Test and Lab Management tool enhances your engineering products’ verification and validation experience?

In the world of engineering product verification and validation (V&V), traceability and efficiency are paramount to giving the earliest green signal for a market launch

Read more...

Streamlining test management — best practices for scheduling and resource allocation blog banner

Streamlining Test Management: Best Practices for Effective Scheduling and Resource Allocation

Efficient management of test requests and scheduling is crucial for any engineering or testing department.

Read more...

Transforming verification plan management with TITAN — overcoming traditional challenges blog banner

Transforming Verification Plan Management with TITAN: Overcoming Traditional Challenges

In today’s fast-paced technological environment, managing verification plans (VPs) with outdated tools like spreadsheets or standalone systems....

Read more...

Streamlining electronics R&D with TITAN advanced testing features blog banner

Streamlining Electronics R&D with TITAN's Advanced Testing Features

In the dynamic world of electronics manufacturing, quality isn’t merely a desirable attribute -- it's critical for achieving market success and maintaining customer trust.

Read more...

Eliminate productivity killers in engineering testing with TITAN blog banner

Eliminate Productivity Killers with TITAN 

Administrative tasks are often the silent killers of productivity, diverting engineering teams from their core mission: driving product improvement,....

Read more...

Maximizing efficiency in test management — TITAN vs custom solutions blog banner

Maximizing Efficiency in Test Management: The Case for Choosing TITAN Over Custom Solutions

You recognize that streamlining and automating your testing processes will enhance quality while reducing costs. As you consider the idea of creating a....

Read more...

Inventory management in test labs — never run out of consumable material with TITAN blog banner

Inventory Management– Never Run Out of Consumable Material Again with TITAN!

In addition to its full end-to-end test management capability, Titan also features a robust Inventory module. Now you can manage all the consumable items that....

Read more...

Preventive maintenance feature in TITAN — equipment uptime in test labs blog banner

Preventive Maintenance – Another Great Feature from TITAN! 

A testing team understands that it is only as good as its equipment.  If equipment is neglected -- or maintained incorrectly -- the organization is at risk,....

Read more...

TITAN — an engineer's ally in test lifecycle management blog banner

TITAN: An Engineer’s Ally

Greetings fellow engineers, we're excited to introduce your new ally, dedicated to your work satisfaction. Over the years, we have had meetings and discussions ....

Read more...

Engineering testing should be standardized too — TITAN standardization blog banner

Standardization: Engineering Testing Should Be Standardized, too!

Engineering and IT executives are continually on the hook to deliver savings while streamlining processes and improving quality....

Read more...

Meeting the crash testing challenge with TITAN TLM — blog banner

Meeting the Crash Testing Challenge

You get one chance to get a crash test right. There are no do overs. You need to ensure every step has been followed meticulously, checked and double checked....

Read more...

DVP essentials — how TITAN guarantees comprehensive test coverage and product quality blog banner

DVP Essentials: How TITAN Guarantees Comprehensive Test Coverage with Enhanced Product Quality

In today's fast-paced manufacturing landscape, product success relies on robust design and validation processes. Rushing products to market can lead to....

Read more...

Standardization of testing practices — how TITAN makes it happen blog banner

Standardization of Testing Practices – How TITAN Makes It Happen!

Enforcing corporate-wide standardization is a challenge. Over the course of doing business, each engineering department has developed specific testing processes....

Read more...

How TITAN provides Flexibility and Configuration Options for your Unique Workflows ?

How TITAN provides Flexibility and Configuration Options for your Unique Workflows ?

When it comes to testing, every organization has its own distinct processes, workflows, and requirements. One-size-fits-all solutions often fall short of....

Read more...

No engineer loves making reports — automated test reporting with TITAN blog banner

I love making reports. Said NO ENGINEER. EVER.

Every engineer procrastinates preparing a test report as the efforts are high and it consumes lot of his engineering hours. Having said that, test reports remain critical....

Read more...

Challenges in autonomous vehicle testing and validation — TITAN blog banner

Challenges in Autonomous Vehicle Testing and Validation

A study, prepared by Strategy Analytics, predicts autonomous vehicles will create a massive economic opportunity that will scale from $800 billion in 2035....

Read more...

Test report generation challenges in the automotive industry — TITAN blog banner

Test Report Generation Challenges In Automotive Industry

Ever wondered how the wheels of vehicle development keep turning smoothly? In the fast-paced realm of vehicle development, where informed decisions....

Read more...

The need for a prototype vehicle management system in automotive R&D blog banner

Need For Prototype Vehicle Management System

Prototype testing has been around for as long as humans have been inventing. Creating the best version of a tool requires trial and error, and without testing,...

Read more...

A complete guide to crash testing for automobiles — TITAN blog banner

A Complete Guide: Crash Testing For Automobile

A Complete Guide: Crash Testing For Automobile Road accidents are the major cause of death worldwide, even after strict rules and heavy...

Read more...

How to manage end-to-end vehicle test processes with TITAN TLM blog banner

How To Manage End-To-End Vehicle Test Process

How To Manage End-To-End Vehicle Test Process Testing Beyond Boundaries With TITAN TITAN has established itself as a leader in vehicle...

Read more...

Test incident and concerns management in TITAN — blog banner

Test Incident & Concerns Management

Test Incident & Concerns Management In developing any new product, you invest a great deal of time and energy into testing your products...

Read more...

Why do you need test lifecycle management? — TITAN explainer blog banner

Why do you need Test Lifecycle Management

Why do you need Test Lifecycle Management We’re living in a time period where we have integrated software tools and apps into every...

Read more...