Test Method Version Control That Stops Old Procedures Running

Author

Neerav Singh — TITAN TLM leadership team member portrait

Neerav Singh

Technical Product Specialist

Test method version control diagram showing document status terms for ISO/IEC 17025

Test Method Version Control That Stops Old Procedures Running

Revision D of a test procedure can be approved on day 1 and still lose to revision B on the day 2, because revision B is the laminated copy taped to the rig.

The pace of external change makes that gap expensive. The figures below come straight from regulators and assessors.

What changedHow often or how muchSource
UN vehicle regulationsWP.29 meets 3 times a year to adopt amendmentsUNECE
Amendments voted in one session27 amendments to existing UN Regulations plus 1 new regulation in June 2025EU Council decision for WP.29 session 196
Where assessors find problemsAround 38% of A2LA ISO/IEC 17025 nonconformities concern equipment records, with technical records also in the top 5A2LA findings published by Ideagen

Many version control failures in test labs begin with words. One engineer says "current" and means the latest draft. Another says "released" and means the version a customer approved last year. The quality manager says "obsolete" and the technician hears "older but still fine for this rig". Fix the vocabulary and a large part of the process fixes itself.

What follows is a working glossary of the 9 terms that decide whether old test methods keep running. Each entry gives a plain definition, the way labs usually get it wrong and what good control looks like in practice.

Effective date

The date a revision becomes the one every new test must use. Approval and effectiveness are separate events, and many labs record only the first.

A revision approved on 1 March with no effective date leaves technicians guessing. Some switch immediately, others finish the week on the old version and a few never hear about the change. A stated effective date, often set 1 or 2 weeks after approval to allow training, gives everyone the same line to cross.

Superseded

A revision that has been replaced by a newer one but may still apply to tests already in progress or to a customer who contracted against it. Superseded methods stay visible and searchable, clearly labelled with what replaced them and when.

Treating superseded and obsolete as the same word causes real damage. A lab that deletes superseded revisions loses the ability to show an assessor exactly which method produced a report issued 2 years ago.

Obsolete

Obsolete describes a revision that must never be used again for new work. ISO/IEC 17025 clause 8.3.2 requires obsolete documents to be withdrawn or clearly marked so nobody uses them by mistake.

The classic obsolete document is a printout. A technician prints the procedure during induction, keeps it by the shaker and carries on using it long after 2 newer revisions are released. Printed copies should carry the revision, the print date and the words "uncontrolled when printed", and the lab should collect them at every release.

Controlled copy

Any copy of a method whose distribution the lab tracks and updates. A procedure on the controlled system is a controlled copy. A PDF emailed to a supplier, a screenshot on a phone or a data sheet saved to a desktop is not.

Data sheets and calculation templates are the controlled copies labs forget most often. A spreadsheet with an embedded acceptance limit of 5% keeps calculating against 5% after the procedure moves to 3%, and the report it produces still says pass. An independent battery and HV lab that later moved to TITAN found its test configurations lived only in individual files rather than a shared repository, so every new programme started from scratch. A shared catalog of templates generated from the released method gave it one approved starting point for every test type.

Point of use

The place where the work happens: the rig, the chamber, the track or the bench. Clause 8.3.2 expects the current revision to be available there.

The strongest control puts the procedure inside the digital test record the technician is already filling in, so the steps, limits and checklists on screen are always the released revision. In TITAN's test catalog, procedures move through approval workflows, every site sees only the released version and an audit trail records who released what and when.

In-flight test

A test that was booked, planned or started under one revision when a newer revision became effective. Many version control policies ignore this term, which is how labs end up running half a test on revision C and half on revision D.

Clause 7.2.1.3 expects a lab to use the latest valid version of a method unless that is not appropriate or possible. Continuing an in-flight test on the older revision is allowed, but only as a recorded decision with a justification, often agreed with the customer. Linking every booking to a specific revision lets the scheduler list every affected test the moment a new revision is released, so the method owner can decide test by test.

Normative reference

The external standard an internal procedure implements, such as a UN regulation, an ISO method or an SAE recommended practice. Each internal procedure should record the reference and its exact revision.

UN regulations evolve through series of amendments and supplements with transitional provisions, and WP.29 adopts changes 3 times a year. Labs that track normative references on a watch list, reviewed monthly against session outcomes and standards body publications, see changes coming months before they enter into force. Without a watch list, the first warning usually comes from a customer or an assessor.

Type approval work makes this term unavoidable. Each report must cite the version of the regulation that applied to that vehicle on that date. A national type approval authority running homologation testing across several departments relied on disconnected systems and manual coordination before moving to TITAN, and producing audit ready documentation was a constant struggle. Unifying customer intake, test management and traceability in one connected system gave it audit ready documentation for each submission.

Method verification

Confirmation that a lab can correctly perform an established method with its own equipment and staff. Clause 7.2.1.5 requires verification before a method is introduced, and a significant revision to a standard method can trigger it again.

Verification records belong with the revision they cover. An assessor reviewing a revision D report will look for evidence that revision D was verified before the first revision D result was issued. A verification record from an earlier revision does not cover the new one.

Method validation

Proof that a method itself is fit for its intended use. Clause 7.2.2 requires validation for non-standard methods, lab-developed methods and standard methods used outside their scope or modified.

The difference from verification is simple to state. Verification checks that the lab can run a proven method correctly. Validation goes a step further and establishes that a new or changed method produces correct answers at all. Labs that modify a standard procedure to suit their fixtures often need validation and record only verification, and assessors catch it.

Putting the 9 terms to work

A glossary changes behaviour once it reaches the test record. For each test, the record should show:

TermWhat the test record captures
Effective dateWhich revision was effective on the test date
Superseded and obsoleteStatus of the revision used and the date it changed
Controlled copyTemplate or data sheet version used to capture results
Point of useConfirmation the released procedure was presented at the rig
In-flight testAny decision to continue on an older revision, with approver
Normative referenceExternal standard and revision implemented
Method verificationLink to the verification record for that revision
Method validationLink to validation where the method was modified or developed in-house

Clause 7.5 asks for technical records detailed enough to repeat a test. Given that technical records already sit among the most common assessment findings, capturing these fields automatically when the test runs removes a whole category of risk. Most of this list overlaps with the controls a lab already needs for ISO 17025 accreditation.

Same words, same revision

Version control breaks down in conversation long before it breaks down in software. When a method owner, a technician and an assessor all mean the same thing by effective, superseded and in-flight, old procedures have nowhere left to hide.

Take these 9 definitions into your next quality meeting and ask each method owner to apply them to one live procedure. Any term they cannot answer from the record marks the next control to build. For labs running homologation testing against regulations that move 3 times a year, that shared vocabulary is what keeps every report tied to the revision that produced it.

FAQ

What is the difference between a superseded and an obsolete test method?

A superseded method has been replaced but may still apply to tests already in progress or contracted against it. An obsolete method must never be used for new work and must be withdrawn or clearly marked under ISO/IEC 17025 clause 8.3.2.

What is the difference between method verification and method validation?

Method verification confirms a lab can correctly perform an established method on its own equipment. Method validation proves that a new, modified or non-standard method is fit for its intended purpose.

How should a lab handle tests already scheduled when a procedure is revised?

Every scheduled test linked to the old revision should be flagged for review. The method owner then decides whether to move each test to the new revision or continue the old one with a documented justification, often agreed with the customer.

Talk to an Expert

Ready to Keep Every Test on the Right Revision?

Bring procedure control, revision history and audit-ready test records together with TITAN.

Recent Blogs

Test lab management software buyer’s checklist for 2027

Test Lab Management Software Buyer's Checklist for 2027

Buying lab software goes wrong more often than most teams expect. In Gartner Digital Markets' 2025 survey of 3,500 software buyers, 59% of buyers

Read more...

Test request management workflow from intake to test-ready in an engineering lab

Test Request Management: Taking a Request from Intake to Test-Ready in an Engineering Lab

A seat belt anchorage test under UN Regulation No. 14 can run as a static pull on a strength rig or as the dynamic sled test that the regulation's Annex 7 allows as an alternative.

Read more...

Test Lifecycle Management vs LIMS comparison for engineering test labs

Test Lifecycle Management vs LIMS: Which System Fits an Engineering Test Lab

A dashboard assembly can pass through 2 labs in the same building within a month.

Read more...

Test lab scheduling workflow coordinating prototypes, rigs, calibration, and technician shifts

Test Lab Scheduling: A Practical Guide for OEM and Tier 1 Test Labs

A design verification plan for a new seat structure can list 140 tests, each with a sample size, an acceptance.

Read more...

Tire testing lab data management workflow connecting multiple test rigs into a single data record

Tire Testing Lab Data Management

Few vehicle components face as many separate tests and rules as the tire, and the pressure keeps rising:

Read more...

AI Scheduling Software for Test Labs: How Finite Capacity Planning Makes AI Useful

AI Scheduling Software for Test Labs: How Finite Capacity Planning Makes AI Useful

A climatic chamber can sit idle for 9 hours on a Tuesday while 3 programmes wait for access. The calendar shows an open slot

Read more...

Booking a third-party test lab with test requirements, documentation, and testing coordination

Booking a Third-Party Test Lab: What to Send and What to Expect

That is how many laboratories held accreditation from signatories of the international accreditation arrangement in 2024, according to ILAC.

Read more...

Battery abuse test lab safety procedures, witness coordination, and evidence documentation

Managing a Battery Abuse Test Lab: Safety Holds, Witnessing and Evidence

A nail penetration test is over in about 10 seconds. The record of that test has to survive for years. Between those two numbers

Read more...

Brake testing lab workflow connecting an inertia brake dynamometer, proving ground track testing and the final brake test report in one chain

Brake Testing Lab Workflow: Dyno, Track and Report in One Chain

A good brake stops a 2 tonne car from 100 km/h in about 3 seconds. Moving that same brake from a dyno cell to the

Read more...

NVH test campaign management showing an electric vehicle tested from component rig and subsystem dyno to full vehicle in an anechoic chamber

NVH Test Campaign Management from Component Rig to Full Vehicle

The decibel meter disagrees, of course. An electric vehicle is quieter overall than the combustion car it replaces.

Read more...

Physical test lab maturity stages after go-live on TITAN test lifecycle management platform

Beyond Go-Live: How Labs Mature on TITAN

A 2020 Boston Consulting Group study found that 70% of digital transformations miss their objectives, leaving just 30% that deliver

Read more...

THOR-50M and Hybrid III 50M crash test dummies compared side by side

THOR-50M vs Hybrid III: A Reference Comparison

Put a THOR-50M and a Hybrid III 50M through the same frontal crash test and they will tell you different stories about

Read more...

Test lab turnaround time measured from test request to approved report

Test Lab Turnaround Time: How to Measure It and How to Cut It

Search for "lab turnaround time" and page 1 belongs to hospitals. The top results discuss specimen accessioning,

Read more...

Developmental Test and Evaluation for verification tracking and test readiness

Developmental Test and Evaluation: The Discipline That Decides Whether a Program Is Actually Ready

A brake controller program carries 312 verification line items across 4 development builds. Build 3 closes 287 of them.

Read more...

Flight test management for test point planning, flight cards, data review, and certification traceability

What Flight Test Management Covers

A certification campaign on a business jet clears 240 test points across 38 sorties. On sortie 22 the instrumentation

Read more...

Idle test rig cost and equipment utilization in an engineering test lab

The Real Cost of an Idle Test Rig

A 4-post hydraulic durability rig carries a replacement value north of $2 million. An environmental chamber rated for combined

Read more...

Evolution of test management tools from spreadsheets to Test Lifecycle Management

The Evolution of Test Management Tools

Type "test management tools" into a search bar and you get 2 unrelated answers. One set of results covers Jira integrations

Read more...

ISO 17025 accreditation workflow for aerospace testing labs linking calibration records, procedure versions and operator credentials to test results

How to Maintain ISO 17025 Accreditation in Aerospace Testing Labs

It starts with a simple audit question: “Can you show me the calibration record for the equipment used in that test?”

Read more...

DVP&R breaks down long before the first test runs. How version control, dependency and resource gaps in spreadsheet verification plans affect program decisions.

Most DVP&R Processes Collapse Before the First Test Even Runs. Here's Why

At some point, the DVP spreadsheet becomes a source of questions instead of answers. Which test count is current?

Read more...

Battery test management for high-volume cell, module and pack labs - scheduling, calibration and traceability with TITAN TLM

Battery Test Management: How High-Volume Cell, Module and Pack Labs Stay in Control

Weeks into a battery cycle life test, the details start to accumulate: thousands of charge-discharge cycles,

Read more...

What Is a LIMS? A Complete Guide to Laboratory Information Management Systems

What Is a LIMS? A Complete Guide to Laboratory Information Management Systems

Test requests arrive. Samples or test articles need to be identified. Equipment has to be available and calibrated.

Read more...

Vibration Testing Management Platform showing shaker hour tracking, equipment utilization, maintenance scheduling, and test lab management with Titan TLM.

Vibration Testing Management: From Shaker Scheduling to Test Reports

Every vibration test bay runs on a simple ledger. Hours available on the shaker minus hours testing equals hours lost and eac

Read more...

Euro NCAP 2026 test lab operations - coordinating validation schedules, equipment and resources with TITAN TLM

Euro NCAP 2026: Inside the Operational Challenge for Test Labs

Euro NCAP 2026 puts a different kind of pressure on the test lab calendar. More safety functions need to be validated across more scenarios, with the right vehicles,

Read more...

UAV testing traceability chain linking a cargo drone from receiving inspection through test execution to airworthiness certification evidence

UAV Testing : Following the Traceability Chain of a Single Aircraft

Somewhere in a UAV qualification programme, a seemingly simple traceability question can become unexpectedly expensive.

Read more...

Automotive test operations unified on TITAN's Test Lifecycle Management platform for faster vehicle development

Faster Automotive Development Starts with Better Test Operations

Modern vehicle programs generate an enormous volume of validation activities, test data, schedules and engineering decisions.

Read more...

Crash test dummy evolution blog cover 75-year journey from Sierra Sam to Hybrid III, THOR and WorldSID in automotive safety

How Crash Test Dummies Changed Automotive Safety

In the late 1940s an Air Force flight surgeon named John Stapp noticed a grim pattern. More of his pilots were dying in cars than in planes.

Read more...

Dashboard representing test management for component manufacturers with centralized test planning, equipment management, DVP tracking, and compliance reporting.

Test Management for Component Manufacturers: How to Run Multi-Customer Validation Without Losing Control

Your lab validates parts for more than one customer. Each OEM arrives with its own requirements, its own report format

Read more...

Illustration of disconnected test workflows in physical labs and the case for connected Test Lifecycle Management

Stop Testing in Isolation: 4 Surprising Lessons from the Ground

Walk into almost any physical test lab and you will find smart people doing careful work inside their own four walls.

Read more...

Automotive test lab visual comparing LIMS with a purpose-built Test Lifecycle Management platform

Why Automotive Testing Labs Need More Than LIMS

When engineers at an automotive testing lab search for software to manage their operations, they often land on LIMS.

Read more...

Gantt chart or project timeline blog cover, TITAN guide to choosing the right view for test project and validation management

Gantt Chart or Timeline? Picking the Right View for Test Project Management

You open your scheduling tool on a Monday and the program looks healthy. Every test sits inside a neat colored bar

Read more...

7 critical problems with manual test tracking blog cover TITAN guide to fixing spreadsheet chaos in engineering test labs

7 Critical Problems with Manual Test Tracking in Engineering test labs

Despite advances in engineering software, many product validation teams still rely on spreadsheets, shared drives and email

Read more...

Test planning best practices blog cover TITAN guide to milestones, dependencies, coverage tracking and plan version control

Test Planning Best Practices: How TITAN Simplifies Test Plans, Milestones and Coverage

Ask a validation lead in any physical product test lab how their test plan started and you will hear about a spreadsheet.

Read more...

Electronic lab notebook ELN for engineering test labs — TITAN blog cover on test data capture, traceability and audit readiness

What Are Electronic Lab Notebooks? A Test Lab View

An electronic lab notebook (ELN) replaces the paper notebook used to record experiments, tests, and observations.

Read more...

Complete guide to test lab management 2026 — TITAN blog cover on scheduling, equipment, maintenance, allocation and reporting

The Complete Guide to Test Lab Management in 2026

Test labs have become one of the most constrained resources in modern product development. Validation timelines are shrinking

Read more...

Test planner guide for hardware validation with test lifecycle management workflow and validation process overview

A Test Planner's Guide to Hardware Validation

Hardware testing sits at the center of every reliable product program. For test planners, the work goes well past

Read more...

Component suppliers improving test lifecycle management with smarter validation, traceability, and engineering test workflows

Why Component Suppliers Are Rethinking Test Lifecycle Management

The global automotive material and component testing market reached roughly US$26.91 billion in 2025 and is on track

Read more...

Unified testing platform vs fragmented tools comparison visual — TITAN TLM blog cover on the cost of tool fragmentation

Advantages of using a Unified Testing Platform Over Fragmented Testing Tools

Ask anyone who runs a physical test lab what their week looks like and you will hear a familiar story. The test plan lands

Read more...

The next 5 years of physical product testing blog thumbnail — TIC industry forecast

The Next 5 Years of Physical Product Testing: A Prediction from the Industry Floor

A product engineer at a mid-size EV components manufacturer spent 14 weeks getting a battery module through

Read more...

How TIC labs can manage growing test volumes without losing control — blog thumbnail

How TIC Labs Can Manage Growing Test Volumes Without Losing Operational Control

The Europe Testing, Inspection and Certification (TIC) market is on a sustained growth path. Valued at USD 58.93 billion in 2025

Read more...

The ultimate guide to automotive crash testing — TITAN blog thumbnail

The Ultimate Guide to Automotive Crash Testing

Every vehicle on the road today carries the invisible fingerprint of crash testing. Before a single unit reaches a customer,

Read more...

How leading chassis and powertrain teams close the test traceability gap — blog thumbnail

How Leading Chassis and Powertrain Teams Are Closing the Test Traceability Gap

The launch of a dedicated chassis and powertrain testing focus at Vehicle Tech Week North America 2026

Read more...

Premium wake boat testing — marine engineering blog thumbnail

Premium Wake Boats and the New Rules of Marine Product Testing

Premium watersports boats have become among the most mechanically complex products in recreational manufacturing.

Read more...

Commercial vehicle test programs blog thumbnail — TITAN heavy-vehicle testing

What Euro NCAP's 2026 Truck Safety Results Mean for Commercial Vehicle Test Programs

Euro NCAP's 2026 truck safety assessment delivered a landmark result: five out of seven vehicles in the Regional Distribution category

Read more...

A Practical Guide to Choosing and Implementing a Laboratory Information Management System (LIMS)

A Practical Guide to Choosing and Implementing a Laboratory Information Management System (LIMS)

If you're still running your lab on a combination of spreadsheets, handwritten logs and shared folders with names

Read more...

What -30°C teaches you about a tire

What -30°C teaches you about a tire

In northern Finland, engineers listen to rubber meet ice in silence so complete it feels deliberate. What they're really chasing consistent

Read more...

When Robots Take the Wheel: What the Bundeswehr's Driverless Testing Shift Means for Modern Test Operations

When Robots Take the Wheel: What the Bundeswehr's Driverless Testing Shift Means for Modern Test Operations

Germany's Bundeswehr operates the Technical Centre for Land-Based Vehicle Systems (WTD 41) in Trier, a facility whose sole mandate is to ensure

Read more...

5 Questions Every VP of Engineering Should Ask About Their Test Operations

5 Questions Every VP of Engineering Should Ask About Their Test Operations

There's a particular kind of silence that falls over a lab when something goes wrong late in the testing cycle. Not the silence of focus or concentration. A heavier kind. The kind that settles

Read more...

Test Data Management: Best Practices for High-Volume Labs

Test Data Management: Best Practices for High-Volume Labs

In a high-volume R&D lab, data is everywhere and that's exactly the alarming problem. Test files, equipment logs, video recordings, structured forms, raw observations

Read more...

Digital Thread in Physical Product Testing: Hype or Reality?

Digital Thread in Physical Product Testing: Hype or Reality?

There is a phrase circulating in engineering circles that sounds almost too good to be true: the digital thread. A single, continuous digital data backbone that connects every phase

Read more...

How Proving Grounds Are Going Digital in 2026

How Proving Grounds Are Going Digital in 2026

Proving grounds have always been the backbone of vehicle validation. Tracks get booked, prototypes get tested, drivers get scheduled and data gets collected.

Read more...

Paper Records vs. LIMS: Choosing the Right Data Management Strategy for Your Lab

Paper Records vs. LIMS: Choosing the Right Data Management Strategy for Your Lab

For decades, paper-based record keeping was the backbone of laboratory operations. Binders stacked on shelves, handwritten test logs, manually updated calibration sheets;

Read more...

TITAN as The Inventory Management Platform

TITAN as The Inventory Management Platform

Running a modern testing or R&D lab without a reliable inventory management system is like navigating without a map. Equipment runs out mid-experiment. Critical spare

Read more...

AI in Test Scheduling: Six Use Cases Worth Watching

AI in Test Scheduling: Six Use Cases Worth Watching

Test scheduling looks administrative from the outside. Inside an engineering lab, it is one of the most layered coordination problems a team faces and one of the

Read more...

What Every Role in Your Test Lab Needs from One Platform

What Every Role in Your Test Lab Needs from One Platform

Running a hardware test lab means managing a constant flow of moving parts, schedules, resources, personnel, data or deadlines. When that flow is smooth,

Read more...

Implementing ALCOA in Your Lab: Gaps, Best Practices and What Good Looks Like

Implementing ALCOA in Your Lab: Gaps, Best Practices and What Good Looks Like

In the previous blog, we covered what the ALCOA principles are and why they apply to engineering and testing laboratories every bit as much as they do to pharmaceutical manufacturing.

Read more...

Why ALCOA Is Not Just a Pharma Principle: What Engineering and Testing Laboratories Need to Know

Why ALCOA Is Not Just a Pharma Principle: What Engineering and Testing Laboratories Need to Know

When most professionals hear the term ALCOA, they think of pharmaceutical manufacturing, clinical trials or FDA-regulated environments. That association is understandable, the ALCOA

Read more...

What Is a Design Verification Plan (DVP)? A Practical Guide for Test Engineers

What Is a Design Verification Plan (DVP)? A Practical Guide for Test Engineers

Design Verification Plans (DVP) sit at the heart of any product development program. They define what gets tested, when, how and to what standard.

Read more...

The Test Scheduling Problem Explained

The Test Scheduling Problem Explained

Ask any test engineer what slows down a program and you'll hear the usual answers. Equipment failures. Scope changes. Resource shortages.

Read more...

Home Grown Tools vs TITAN

Home Grown Tools vs TITAN

That internal tool your team built seven years ago. It was genuinely impressive at the time. Someone on the team had a problem; nobody had a budget for a proper solution

Read more...

3 Questions Your Dashboard Should Answer Instantly

3 Questions Your Dashboard Should Answer Instantly

There's a framework in operations management that measures any operation across four dimensions - Volume, Variety, Variation and Visibility.

Read more...

How Smart Scheduling Is Beating Million-Dollar Equipment Investments?

How Smart Scheduling Is Beating Million-Dollar Equipment Investments?

You invested heavily in advanced equipment because precision matters. Calibration matters. Speed to market matters. Yet despite those investments,

Read more...

Crash Test Dummies Aren’t Props, They’re Precision Instruments

Crash Test Dummies Aren’t Props, They’re Precision Instruments

Step into a contemporary crash testing facility and one thing becomes clear almost immediately.

Read more...

OEM and the Hidden Cost of Fragmentation: Why Test Lifecycle Management Matters?

OEM and the Hidden Cost of Fragmentation: Why Test Lifecycle Management Matters?

Picture a weekly sync inside an automotive OEM program, their verification and validation (V&V) teams racking their brains over spreadsheets.

Read more...

How Do You Build ISO/IEC 17025 Ready Labs with End-to-End Digital Traceability?

How Do You Build ISO/IEC 17025 Ready Labs with End-to-End Digital Traceability?

If you run or work with testing and calibration laboratories whether as an OEM lab, an independent testing facility

Read more...

Any Ambition Bigger Than a Spreadsheet?

Any Ambition Bigger Than a Spreadsheet?

Imagine this: It's late on a Friday evening, and Sarah, a dedicated vehicle test engineer at a leading R&D organization,

Read more...

The Cost of Inaction: Why Testing Teams Can't Afford to Delay a Test Lifecycle Management Solution

The Cost of Inaction: Why Testing Teams Can't Afford to Delay a Test Lifecycle Management Solution

Many engineering leaders already know their testing teams need a centralized system. The challenge?

Read more...

Best Practices in Lab Asset Management with Titan

Best Practices in Lab Asset Management with Titan

Modern laboratories operate under constant pressure: deliver accurate results faster, manage rising costs,

Read more...

Test Lifecycle Management Explained: What Every Engineering Team Needs to Know

Test Lifecycle Management Explained: What Every Engineering Team Needs to Know

When it comes to product development, testing is more than a box to check it’s the process that validates safety, performance,

Read more...

Can your booking tool do more than just schedule?

Can your booking tool do more than just schedule?

Titan's Booking Portal does more than just schedule. It’s a single platform that links test requests,

Read more...

Modernizing Lab Bookings: Email Requests vs. Titan Portal

Modernizing Lab Bookings: Email Requests vs. Titan Portal

When managing test labs or proving grounds, it’s common to rely on email threads and manually filled forms from customers

Read more...

TITAN for greenfield OEMs — managing the complete test lifecycle beyond your walls blog banner

Titan for Greenfield OEMs: Managing the Complete Test Lifecycle Beyond Your Walls

Building a product from the ground up as a Greenfield OEM comes with unique challenges.

Read more...

TITAN template-driven multi-product test management blog banner

How Titan’s Template-Driven Approach Simplifies Multi-Product Line Test Management

Engineering teams managing diverse product lines often face the challenge of maintaining consistency,

Read more...

How TITAN supports laboratories in achieving ISO/IEC 17025 compliance blog banner

How TITAN Supports Laboratories in Achieving ISO/IEC 17025 Compliance

Laboratories across industries are tasked with ensuring the highest standards of testing and calibration.

Read more...

Managing test articles seamlessly with TITAN — from creation to retirement blog banner

Managing Test Articles Seamlessly with Titan - from Creation to Retirement

In the world of product testing, managing prototype samples and test articles is often a logistical challenge.

Read more...

Rethinking test data governance — TITAN powers compliance, transparency and efficiency blog banner

Rethinking Test Data Governance: How TITAN Powers Compliance, Transparency, and Efficiency

In today’s data-driven testing environment, governance leaders face increasing pressure to ensure compliance

Read more...

Bridging the scheduling gap in modern test labs — TITAN best ally blog banner

Bridging the Scheduling Gap for Modern Test Labs: Why TITAN Is Your Lab's Best Ally

Imagine this: A test lab under constant pressure to meet deadlines is struggling with delays and resource conflicts.

Read more...

From feedback to feature — addition of inventory management to TITAN blog banner

From Feedback to Feature: The Addition of Inventory Management in TITAN

Over the years, Titan has evolved by listening closely to the needs and feedback of our customers. As a company that values

Read more...

The essential synergy — enhancing engineering verification with unified test and lab management blog banner

The Essential Synergy: How a unified Test and Lab Management tool enhances your engineering products’ verification and validation experience?

In the world of engineering product verification and validation (V&V), traceability and efficiency are paramount to giving the earliest green signal for a market launch

Read more...

Streamlining test management — best practices for scheduling and resource allocation blog banner

Streamlining Test Management: Best Practices for Effective Scheduling and Resource Allocation

Efficient management of test requests and scheduling is crucial for any engineering or testing department.

Read more...

Transforming verification plan management with TITAN — overcoming traditional challenges blog banner

Transforming Verification Plan Management with TITAN: Overcoming Traditional Challenges

In today’s fast-paced technological environment, managing verification plans (VPs) with outdated tools like spreadsheets or standalone systems....

Read more...

Streamlining electronics R&D with TITAN advanced testing features blog banner

Streamlining Electronics R&D with TITAN's Advanced Testing Features

In the dynamic world of electronics manufacturing, quality isn’t merely a desirable attribute -- it's critical for achieving market success and maintaining customer trust.

Read more...

Eliminate productivity killers in engineering testing with TITAN blog banner

Eliminate Productivity Killers with TITAN 

Administrative tasks are often the silent killers of productivity, diverting engineering teams from their core mission: driving product improvement,....

Read more...

Maximizing efficiency in test management — TITAN vs custom solutions blog banner

Maximizing Efficiency in Test Management: The Case for Choosing TITAN Over Custom Solutions

You recognize that streamlining and automating your testing processes will enhance quality while reducing costs. As you consider the idea of creating a....

Read more...

Inventory management in test labs — never run out of consumable material with TITAN blog banner

Inventory Management– Never Run Out of Consumable Material Again with TITAN!

In addition to its full end-to-end test management capability, Titan also features a robust Inventory module. Now you can manage all the consumable items that....

Read more...

Preventive maintenance feature in TITAN — equipment uptime in test labs blog banner

Preventive Maintenance – Another Great Feature from TITAN! 

A testing team understands that it is only as good as its equipment.  If equipment is neglected -- or maintained incorrectly -- the organization is at risk,....

Read more...

TITAN — an engineer's ally in test lifecycle management blog banner

TITAN: An Engineer’s Ally

Greetings fellow engineers, we're excited to introduce your new ally, dedicated to your work satisfaction. Over the years, we have had meetings and discussions ....

Read more...

Engineering testing should be standardized too — TITAN standardization blog banner

Standardization: Engineering Testing Should Be Standardized, too!

Engineering and IT executives are continually on the hook to deliver savings while streamlining processes and improving quality....

Read more...

Meeting the crash testing challenge with TITAN TLM — blog banner

Meeting the Crash Testing Challenge

You get one chance to get a crash test right. There are no do overs. You need to ensure every step has been followed meticulously, checked and double checked....

Read more...

DVP essentials — how TITAN guarantees comprehensive test coverage and product quality blog banner

DVP Essentials: How TITAN Guarantees Comprehensive Test Coverage with Enhanced Product Quality

In today's fast-paced manufacturing landscape, product success relies on robust design and validation processes. Rushing products to market can lead to....

Read more...

Standardization of testing practices — how TITAN makes it happen blog banner

Standardization of Testing Practices – How TITAN Makes It Happen!

Enforcing corporate-wide standardization is a challenge. Over the course of doing business, each engineering department has developed specific testing processes....

Read more...

How TITAN provides Flexibility and Configuration Options for your Unique Workflows ?

How TITAN provides Flexibility and Configuration Options for your Unique Workflows ?

When it comes to testing, every organization has its own distinct processes, workflows, and requirements. One-size-fits-all solutions often fall short of....

Read more...

No engineer loves making reports — automated test reporting with TITAN blog banner

I love making reports. Said NO ENGINEER. EVER.

Every engineer procrastinates preparing a test report as the efforts are high and it consumes lot of his engineering hours. Having said that, test reports remain critical....

Read more...

Challenges in autonomous vehicle testing and validation — TITAN blog banner

Challenges in Autonomous Vehicle Testing and Validation

A study, prepared by Strategy Analytics, predicts autonomous vehicles will create a massive economic opportunity that will scale from $800 billion in 2035....

Read more...

Test report generation challenges in the automotive industry — TITAN blog banner

Test Report Generation Challenges In Automotive Industry

Ever wondered how the wheels of vehicle development keep turning smoothly? In the fast-paced realm of vehicle development, where informed decisions....

Read more...

The need for a prototype vehicle management system in automotive R&D blog banner

Need For Prototype Vehicle Management System

Prototype testing has been around for as long as humans have been inventing. Creating the best version of a tool requires trial and error, and without testing,...

Read more...

A complete guide to crash testing for automobiles — TITAN blog banner

A Complete Guide: Crash Testing For Automobile

A Complete Guide: Crash Testing For Automobile Road accidents are the major cause of death worldwide, even after strict rules and heavy...

Read more...

How to manage end-to-end vehicle test processes with TITAN TLM blog banner

How To Manage End-To-End Vehicle Test Process

How To Manage End-To-End Vehicle Test Process Testing Beyond Boundaries With TITAN TITAN has established itself as a leader in vehicle...

Read more...

Test incident and concerns management in TITAN — blog banner

Test Incident & Concerns Management

Test Incident & Concerns Management In developing any new product, you invest a great deal of time and energy into testing your products...

Read more...

Why do you need test lifecycle management? — TITAN explainer blog banner

Why do you need Test Lifecycle Management

Why do you need Test Lifecycle Management We’re living in a time period where we have integrated software tools and apps into every...

Read more...